Planning
Material booking and line scheduling against your confirmed spec, quantity and deadline, with season risk flagged early.
Scale from a confirmed sample to volume production with stable specs, in-line and final inspection, and export-ready packing - without quality drifting between runs or between cartons.
Your files stay confidential - NDA available on request.
Disciplined bulk manufacturing.
Bulk production starts only after the golden sample is signed - never before. That single rule prevents the most common and most expensive failure in footwear sourcing: scaling a design that was never truly confirmed. With the reference pair in hand, we book the approved materials, schedule the line, and hold the confirmed construction and bill of materials through the whole run.
Quality is controlled in two layers rather than checked once at the end. In-line monitoring catches problems while they are still cheap to fix - cutting and stitching consistency, upper-to-sole bonding, lasting tension, assembly alignment. A defect found at the bonding station is a quick correction; the same defect found in a packed carton is a rejected shipment. Catching it early is what keeps yield and cost stable.
The finished pairs then go through a final inspection to an agreed AQL (acceptance quality limit). Buyers commonly specify 2.5 major / 4.0 minor, but we inspect to whatever level your program or retailer requires, checking construction, sizing, finish, matching pairs and packing. The golden sample is the yardstick - the question at final is always "does this match the approved pair?".
You retain control of verification. You can book SGS, BV, Intertek or your own QC team for the final inspection, and we coordinate factory access, sample pulls and timing. Independent inspection is welcome, not resisted - it is how serious importers de-risk a container. For the wider quality system, see quality control.
Lead time is typically 30-45 days after sign-off, varying with quantity, material lead times and season. Plan extra buffer around Chinese New Year, when the whole supply chain pauses. When the run finishes, cartons are marked, packing lists prepared and export documents readied so the order is forwarder-ready - see packaging & export.
Material booking and line scheduling against your confirmed spec, quantity and deadline, with season risk flagged early.
Checks during production - cutting, stitching, bonding, lasting, assembly - to catch issues before they reach final packing.
AQL inspection of finished pairs for construction, sizing, finish, pair matching and packing, against the golden sample.
Carton marks, packing list and export documents prepared so the order is ready for your forwarder.
At volume, the risk is not making the shoe once - it is making the ten-thousandth pair identical to the golden sample.
Held tooling, recorded BOM and the golden sample keep every PO consistent.
In-line monitoring plus final AQL means defects are caught early, not in a packed carton.
Bring your own or a third-party inspector - we coordinate access, we don't resist scrutiny.
Volume is reached in controlled steps, so process problems surface on a small batch rather than the full order.
The signed reference pair that triggers and defines the whole run.
A small production batch to prove the line repeats the sample at speed.
Full volume with in-line monitoring and a final AQL inspection before packing.
Send market, category, size range, target material, logo and quantity. Tech packs or reference pairs welcome.
We review construction and branding, flag DFM issues, then return a sample plan and quotation route.
We develop the sample, adjust fit and finish, and lock the golden sample before bulk.
In-line and final inspection, then carton marking, packing list and ship-ready export documents.
Share the market, product category, size range, materials and logo requirements. We reply with construction options, sample plan and pricing route.
Response target: one business day · Sample plan confirmed before payment · NDA available on request